-
Notifications
You must be signed in to change notification settings - Fork 6.1k
Pull requests: pingcap/tidb
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
parser: use ParenthesesExpr for literal value in DefaultValueExpr
contribution
This PR is from a community contributor.
needs-ok-to-test
Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#65149
opened Dec 19, 2025 by
kolbe
Loading…
3 of 13 tasks
planner: suppress column number in plan_tree explain
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#65148
opened Dec 19, 2025 by
terry1purcell
Loading…
1 of 13 tasks
statistics: avoid deadlock in priority queue Close method
component/statistics
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
sig/planner
SIG: Planner
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#65147
opened Dec 19, 2025 by
0xPoe
Loading…
2 of 13 tasks
planner: fix tidb_enforce_mpp cannot work
do-not-merge/needs-triage-completed
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#65146
opened Dec 19, 2025 by
hawkingrei
Loading…
1 of 13 tasks
*: use IsColOpCol to remove the same code
do-not-merge/needs-linked-issue
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#65144
opened Dec 19, 2025 by
hawkingrei
Loading…
1 of 13 tasks
br: fixed set-file on Cherry pick PR approved by release team.
lgtm
ok-to-test
Indicates a PR is ready to be tested.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
type/cherry-pick-for-release-8.5
This PR is cherry-picked to release-8.5 from a source PR.
CopiedSST may cause panic (#65108)
approved
cherry-pick-approved
#65142
opened Dec 19, 2025 by
ti-chi-bot
Loading…
2 of 13 tasks
[DNM]: *
component/statistics
do-not-merge/needs-linked-issue
do-not-merge/needs-tests-checked
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
planner: parameterize first for the non-prepare statement to skip the PlanCacheable check
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#65140
opened Dec 19, 2025 by
Reminiscent
Loading…
1 of 13 tasks
infoschema: fix TableName2ID case sensitivity issue
approved
lgtm
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#65139
opened Dec 19, 2025 by
wjhuang2016
Loading…
1 of 13 tasks
Release-testing: v8.5.5 tidb repo CI trigger
do-not-merge/cherry-pick-not-approved
release-note-none
Denotes a PR that doesn't merit a release note.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#65138
opened Dec 19, 2025 by
stevenayu
Loading…
13 tasks
[DNM] *: test
do-not-merge/needs-linked-issue
do-not-merge/needs-tests-checked
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#65137
opened Dec 19, 2025 by
joechenrh
Loading…
13 tasks
[WIP] lightning: check memory and schema before importing parquet
do-not-merge/needs-tests-checked
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#65136
opened Dec 19, 2025 by
joechenrh
Loading…
13 tasks
planner: fix prefer task logic when enumerate physical limit/topn | tidb-test=pr/2622 (#64151)
cherry-pick-approved
Cherry pick PR approved by release team.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
type/cherry-pick-for-release-8.5
This PR is cherry-picked to release-8.5 from a source PR.
#65134
opened Dec 19, 2025 by
ti-chi-bot
Loading…
2 of 13 tasks
ddl: support region split policy
ok-to-test
Indicates a PR is ready to be tested.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#65133
opened Dec 19, 2025 by
xhebox
Loading…
2 of 13 tasks
dumpling: New terminology for MySQL (#57188)
component/dumpling
This is related to Dumpling of TiDB.
do-not-merge/cherry-pick-not-approved
ok-to-test
Indicates a PR is ready to be tested.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#65131
opened Dec 18, 2025 by
dveeden
Loading…
2 of 13 tasks
sessiontxn/staleread: don't overwrite StaleTSOProvider for single statement (#65110)
approved
cherry-pick-approved
Cherry pick PR approved by release team.
lgtm
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
type/cherry-pick-for-release-8.5
This PR is cherry-picked to release-8.5 from a source PR.
#65128
opened Dec 18, 2025 by
ti-chi-bot
Loading…
2 of 13 tasks
planner: fix no access path when TiKV read is disabled under RC isolation
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#65127
opened Dec 18, 2025 by
hawkingrei
Loading…
1 of 13 tasks
server: fix flaky test TestPlanReplayerWithMultiForeignKey (#64942)
approved
do-not-merge/cherry-pick-not-approved
lgtm
release-note-none
Denotes a PR that doesn't merit a release note.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
type/cherry-pick-for-release-8.5
This PR is cherry-picked to release-8.5 from a source PR.
#65120
opened Dec 18, 2025 by
ti-chi-bot
Loading…
1 of 13 tasks
planner: optimize the schema check phase in the plan cache path
do-not-merge/needs-tests-checked
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#65118
opened Dec 18, 2025 by
Reminiscent
•
Draft
2 of 13 tasks
build(deps): bump golang.org/x/oauth2 from 0.33.0 to 0.34.0
dependencies
Pull requests that update a dependency file
do-not-merge/needs-linked-issue
do-not-merge/needs-tests-checked
do-not-merge/release-note-label-needed
Indicates that a PR should not merge because it's missing one of the release note labels.
go
Pull requests that update Go code
needs-ok-to-test
Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#65116
opened Dec 18, 2025 by
dependabot
bot
Loading…
addindex: remove reader ration undex DXF
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#65111
opened Dec 18, 2025 by
GMHDBJD
Loading…
1 of 13 tasks
unistore: support return _tidb_commit_ts for coprocessor request | tidb-test=feature/active-active tikv=feature/active-active
approved
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#65107
opened Dec 18, 2025 by
tiancaiamao
Loading…
1 of 13 tasks
executor, sessionctx: remove MemArbitrator from slow log rules
approved
lgtm
release-note-none
Denotes a PR that doesn't merit a release note.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
skip-issue-check
Indicates that a PR no need to check linked issue.
#65105
opened Dec 18, 2025 by
zimulala
Loading…
1 of 13 tasks
planner: plan cache performance optimization | tidb-test=86a1cff755f507d127f0bca7ff18e2f3b9537124
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#65099
opened Dec 17, 2025 by
qw4990
Loading…
13 tasks
tici: Adapt new shard cache impl | tidb-test=a9bf2dca824dc746361234cd4d763178e0eedd13
release-note-none
Denotes a PR that doesn't merit a release note.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#65097
opened Dec 17, 2025 by
wshwsh12
Loading…
1 of 13 tasks
Previous Next
ProTip!
Adding no:label will show everything without a label.